Free Gantt Software: Pick a Gantt chart tool that stays free after the trial ends

Free Gantt software covers tools such as GanttProject and OnlineGantt, where a project timeline is drawn without a paid licence.
The exact-match phrase "free gantt software" describes a crowded category, and the word free carries at least three different meanings inside it. Some tools are open-source desktop applications with no account at all. Some are browser tools that never ask for payment. Others are commercial platforms whose free tier is a permanent but limited plan sitting beside a paid upgrade. The distinction matters before a single task is entered, because migrating a live project between tools costs more time than choosing carefully at the start.
Across nine pages reviewed for this topic, the median page ran to 812 words and 14 headings, six of the nine carried a list, six carried an FAQ block, and only one carried a comparison table. That gap is useful. A table forces the free-tier question into the open, while a roundup can describe ten tools without ever stating whether the free plan survives month two.
Free Gantt Software. what the free tier usually includes
Free tiers in this category tend to converge on the same core: a bar chart across a date range, tasks with start and end dates, and some form of dependency link between tasks. What varies is everything around that core.
Typical inclusions on a permanent free plan:
  • A single project or a small number of active projects
  • Task names, durations, and a draggable timeline
  • Basic dependency links, sometimes limited to finish-to-start
  • One or two views, usually the Gantt view plus a list or board
  • Limited or no guest access for people outside the team
Typical exclusions, which is where the free tier usually bites:
  • Critical path calculation and automatic rescheduling
  • Baseline comparison against the original plan
  • Workload or resource levelling across people
  • Export to PDF, image, or project file formats
  • Portfolio views spanning multiple projects
None of those exclusions are dishonest. They are the natural boundary of a free product. The problem is that they are rarely listed together in one place, so a team discovers the limit only when a stakeholder asks for a PDF of the schedule.
Six free Gantt software options and who each one suits
The tools below appeared repeatedly across the pages reviewed for this topic. Each entry names the single situation it fits best. Free-tier specifics should be confirmed on each vendor's own plans page before a project is committed, because plan terms change and the reviewed pages did not verify current limits.
  1. GanttProject — best when the schedule must live on the machine and no account should be created. It is a desktop application for Windows, macOS, and Linux, and the reviewed page describes it as local-first and aimed at small and medium businesses.
  2. OnlineGantt — best when a chart is needed immediately with no signup and no download. The reviewed page presents it as free online Gantt chart software with no registration step.
  3. Ganttile — best when the free tier must include the scheduling logic, not just the bars. The reviewed page lists critical path for tasks, automatic project scheduling, and export and share among its features, and states that everything is included.
  4. TeamGantt — best for schedule-driven teams that want drag-and-drop planning and workload visibility. The reviewed page describes it as online Gantt chart software for schedule-driven teams and offers a 14-day trial rather than a permanent free plan.
  5. GanttPRO — best when the team wants a polished online chart maker and is willing to evaluate on a trial. The reviewed page offers a free 14-day trial to premium features with no credit card required.
  6. Microsoft Excel — best when the team already works in a spreadsheet and wants a template rather than another account. The reviewed Excel page offers free Gantt chart templates for visualising a project schedule, dependencies, and task completion over time.
Two of those six are trials rather than permanent free plans, and that is the single most important thing the list communicates. A trial is not a free tier. It is a full-feature evaluation window that ends, and any project built inside it will need a decision at the end of the window.
How to tell a permanently free tool from a trial
The wording on a vendor page usually gives the answer away before any pricing table does. A permanent free plan is described with words like forever, always, no credit card, or free plan. A trial is described with a number of days, a phrase like start your free trial, or a note that no credit card is required for the trial period.
Three checks settle the question quickly:
  1. Look for a day count. "14-day free trial" is a trial. "Free forever" is a plan.
  2. Look for the word plan next to the word free. A free plan sits inside a pricing structure and usually has a stated user or project cap.
  3. Look for what happens to existing data. A trial that converts to read-only leaves the schedule visible but frozen, which is a different outcome from losing access entirely.
There is a fourth signal that is easy to miss. Open-source desktop tools such as GanttProject do not have a pricing page at all, because there is no commercial tier to sell. The absence of a pricing page is itself evidence of a different funding model, and it usually means the free version is the product rather than a sample of it.
Task dependencies, milestones, and export limits to check first
Dependencies are the feature that separates a Gantt chart from a bar chart. Without them, moving one task does not move the tasks that follow, and the schedule becomes a drawing rather than a plan. Before committing a project to any free tier, confirm four things.
Dependency types. Finish-to-start is the common default. Start-to-start, finish-to-finish, and start-to-finish links are less commonly available on free plans, and they matter for work that runs in parallel.
Automatic rescheduling. Some tools move dependent tasks when a predecessor slips. Others require the change to be made by hand. The reviewed Ganttile page lists automatic project scheduling as a feature, which is the behaviour to look for.
Milestones. A milestone is a zero-duration marker for a decision point, a delivery, or a sign-off. It is a small feature that is frequently absent from free tiers, and its absence makes a schedule harder to read at a glance.
Export. This is the most common free-tier wall. A schedule that cannot leave the tool cannot be sent to a client, attached to a report, or archived at project close. The reviewed Ganttile page lists export and share in PDF, image, Excel, and Microsoft Project formats, and the reviewed GanttPRO page lists export among its features. Whether those sit inside the free tier or behind the paid upgrade is the question to answer before the project starts.
Where free Gantt software stops being enough
A free tier holds up well for a single project with a handful of people and a schedule measured in weeks. It starts to strain at predictable points.
The first strain is parallel projects. Once two or three projects share the same people, the question stops being "when does this task finish" and becomes "who is double-booked next Thursday". Workload management across projects is a paid-tier feature in most of the tools reviewed, and it is the point at which a free plan stops answering the actual question.
The second strain is external stakeholders. Free tiers commonly limit guest access, so clients, contractors, and suppliers cannot see the schedule directly. The workaround is exporting and emailing, which reintroduces version control problems that the Gantt chart was meant to remove.
The third strain is reporting. A schedule is a plan; a report is evidence of progress against it. Baseline comparison, progress tracking, and time logs appear on paid tiers in the reviewed pages, and without them the free tool shows where the project should be rather than where it actually is.
The fourth strain is governance. Where a schedule carries contractual dates, approval gates, or audit requirements, a tool with no access controls, no change history, and no exportable record is a poor fit regardless of price. The cost of the paid tier is usually smaller than the cost of reconstructing a disputed timeline from memory.
None of this argues against starting free. It argues for knowing the exit point in advance, so the migration happens between projects rather than in the middle of one.
Free Gantt Software. questions Malaysian teams ask before choosing
Is there a genuinely free Gantt tool with no limits at all? The reviewed pages include claims of free-forever access with everything included, but no supplied source independently verifies seat caps, project limits, or export restrictions for any named tool. Treat any unlimited claim as something to confirm on the vendor's own plans page.
Does Excel count as free Gantt software? Excel templates produce a Gantt-style chart from spreadsheet data, and the reviewed Excel page offers free templates for exactly that. The trade-off is that dependencies and rescheduling are manual, so the chart reflects the data entered rather than recalculating it.
Can a free plan handle multiple projects? Some can, and the reviewed Ganttile page lists multi-project management among its features. The practical limit is usually not the number of projects but the absence of cross-project workload views, which is where shared people become invisible.
What happens to the schedule when a trial ends? This depends entirely on the vendor. Some convert the workspace to read-only, some lock features but keep data visible, and some require an upgrade to retain access. The answer should be found in the vendor's own terms before a live project is built inside a trial.
Is offline access available? Desktop tools such as GanttProject are described as local-first, which implies the schedule lives on the machine. Browser-based tools generally require a connection. No supplied source confirms offline behaviour for the browser tools reviewed, so this should be tested directly if offline work matters.
Which free tool suits a small Malaysian team starting out? The honest answer is that the choice depends on whether the schedule needs to leave the tool. If it stays internal, a desktop or browser tool with dependencies is sufficient. If it goes to clients or contractors, export capability moves to the top of the checklist, and that single requirement narrows the field faster than any feature comparison.
The wider point is that free Gantt software is a starting position, not a permanent architecture. Teams that treat the free tier as a way to learn what the schedule actually needs tend to make a better paid decision later than teams that pick a paid tool first and discover the requirement afterwards.
free gantt software: Practical Guide